Doosan DL350-5 Loader Clutch -KV and KR Disassembly

 This article introduces doosan DL350-5 Loader Clutch -KV and KR Disassembly

 2023.07 Doosan DMS-5 Data Monitoring System Diagnostic Software

1.   Squeeze rectangular ring out (Arrow).

NOTE:       The following figures show the disassembly of

Clutch  -KV.The  disassembly of Clutch  -KR  is similar.


  

2.   Pull tapered roller bearing from the shaft.

3.   Remove opposite tapered roller bearing accordingly. (S)Grab  sleeve  -5873001057

(S)Grab   sleeve   -5873001059

(S)Basic   set-5873001000






4.4.Squeeze retaining ring out. 




Separate plate carrier from the shaft.
(S) ThreeOleg puller-5870970003

 



  Doosan Diagnostic Tool UVIM Support Doosan Excavators High Quality

 6.
Squeeze retaining ring out and remove plate pack.

 

 


 

  7.
Preload compression spring, squeeze retaining ring out and remove components.
(S) Assembly aid -5870345088

 

 



8.Lift piston using compressed air out of the cylinder bore and remove it.

 


   

9.  Remove both O-rings (Arrows).






HA9M2045
Figure 151
 

10. Lift idler gear a bit using pry bars (Figure 153).
11. Apply puller and separate idler gear from the clutch shaft
(Figure 154).

 


  12.Squeeze retaining ring out and remove ball bearing.
The disassembly of Clutch -KR has to be carried out accordingly.
NOTE: The disassembly of Clutch -KR has to be carried out accordingly.


 



 Doosan Machine Engine Diagnostic Software Package 2024 One PC Installation

评论

此博客中的热门博文

How to Replace Doosan DA-30-5 Truck Filter

How to Solve the Problem of Intermittent Alarm and Speed limit of 1400RPM When the DX60-9C Excavator Engine is Working

How to Solve the Walking Failure of Doosan DH220-V Excavator