博文

目前显示的是 六月, 2024的博文

Doosan DL350-5 Loader Clutch -KV and KR Disassembly

图片
  This article introduces doosan DL350-5 Loader Clutch -KV and KR Disassembly   2023.07 Doosan DMS-5 Data Monitoring System Diagnostic Software 1.     Squeeze rectangular ring out   (Arrow). NOTE:        The   following   figures   show   the   disassembly   of Clutch  -KV.The  disassembly   of   Clutch  -KR  is  similar .    2.    Pull tapered   roller   bearing from the   sha ft. 3.    Remove   opposite tapered   roller   bearing   accord ingly.   (S)Grab    sleeve    -5873001 057 (S)Grab   sleeve     -5873001059 (S)Basic     set-5873001000 4. 4. Squeeze retaining ring out.  Separate plate carrier from the shaft. (S) ThreeOleg puller-5870970003     Doosan Diagnostic Tool UVIM Support Doosan Excavators High Quality  6. Squeeze retaining ring out and remove plate pack.         7. Preload compression spring, squeeze retaining ring out and remove components. (S) Assembly aid -5870345088     8.Lift piston using compressed air out of the cylinder bore and remove it.       9.  Remove both O